The Heber Valley Rail Trail Is Getting Closer: What We Know About the New Trail Along the Railroad

Heber Valley is known for trails, but there's an interesting contradiction in that reputation.

We have miles of mountain biking and hiking in the mountains surrounding the valley, yet getting from one part of the community to another without a car can still be surprisingly difficult. A family may have excellent trails just a few miles from home while lacking a comfortable walking or biking connection to reach another neighborhood, park, school or part of town.

One project is designed to help change that.

The Heber Valley Rail Trail is a planned paved trail following portions of the historic Heber Valley Railroad corridor. It is intended to create an important new active-transportation connection through Wasatch County and tie into other trails already being developed throughout the valley.

And after years of planning, environmental work and public discussion, the project appears to be getting much closer to construction.

As of September 2026, UDOT says plans are under review with the U.S. Army Corps of Engineers. The state anticipates advertising the project for construction bids in September, with construction potentially beginning as early as December 2026.

For anyone who walks, runs or bikes in Heber Valley, this is a project worth knowing about.

What Is the Heber Valley Rail Trail?

The Heber Valley Rail Trail is exactly what the name suggests: a trail built alongside portions of the historic railroad corridor.

UDOT describes the project as an important connection between existing and planned active-transportation systems in Heber City and surrounding communities. The goal isn't simply to build another recreational path. It's to create infrastructure that people can use to move through the valley without relying entirely on a vehicle.

That distinction matters.

A mountain biking trail high in the Wasatch Mountains is a recreational destination. You load bikes onto a rack, drive to the trailhead and ride for fun.

A community trail can serve a different purpose. People can walk the dog, ride a bike to another neighborhood, go for a run, reach a park or eventually connect to a broader network of trails.

Ideally, the same trail can do both.

The Heber Valley Rail Trail is part of a much larger effort to make those connections possible.

Why Put a Trail Along the Railroad?

The Heber Valley Railroad provides something extremely valuable in transportation planning: an established corridor running through the valley.

The railroad itself is one of Heber Valley's most recognizable attractions, but the tracks also represent a continuous transportation route that has existed for generations. Creating a trail near that corridor can allow planners to connect parts of the valley without inventing an entirely new pathway through neighborhoods and private property.

There is also something fitting about the idea.

The railroad originally connected Heber Valley residents with communities beyond the mountains. More than a century later, the corridor could help provide another form of transportation—this time for bicycles and pedestrians.

The train isn't going anywhere. The Heber Valley Railroad continues operating passenger excursions and special events throughout the year.

The idea is to allow another transportation system to coexist with it.

This Isn't Just a Scenic Trail

Calling something a “trail” can make it sound like an amenity that's primarily useful on Saturday mornings.

UDOT categorizes the Rail Trail as an active transportation project.

Active transportation is the planning term for ways of getting around that don't depend primarily on motorized vehicles, particularly walking and bicycling.

That's important in Heber Valley because transportation conversations here tend to focus overwhelmingly on cars.

How many lanes should US-40 have? Where should the Heber bypass go? How can intersections handle more traffic? Where will new roads be built as development expands?

Those are legitimate questions, especially in a rapidly growing county.

But adding road capacity isn't the only way to improve mobility.

If a teenager can safely bike to a friend's house instead of needing a ride, that's one fewer car trip. If someone can walk to a park rather than drive, that's another. If a resident can eventually connect from one community trail to another without mixing with high-speed traffic, biking becomes a realistic transportation choice for more people.

No trail is going to solve Heber Valley's traffic problems by itself.

A connected network, however, gives residents another option.

Where Will the Rail Trail Go?

The project has been divided into sections as planning has moved forward.

UDOT's current materials identify Section C of the Heber Valley Rail Trail as one of the agency's major 2026 projects. The state describes it as providing a significant connection between active-transportation systems in the area and encouraging alternatives to driving within Heber City and surrounding communities.

The project has required environmental review in part because of the terrain and resources around the railroad corridor. A public open house was held at the Wasatch County Library in April 2025 as part of that process, and a draft environmental study was made available for review.

That environmental work is one reason residents haven't already seen construction equipment building the trail.

Transportation projects often spend years in stages that aren't visible from the road: surveying, engineering, environmental review, permitting and coordination with other agencies.

The Rail Trail is now much farther along that process.

The Current Timeline: Construction Could Begin This Winter

This is the most significant current update.

UDOT's project page says the plans are currently under review with the U.S. Army Corps of Engineers.

The state anticipates advertising the project for construction bids in September 2026, with construction potentially beginning as early as December 2026.

That timeline is still subject to change.

Permits, weather, contractor schedules and other issues can affect transportation projects, and a December start in Heber Valley obviously introduces another variable: winter.

Still, the fact that UDOT is discussing construction bidding rather than conceptual planning tells us something important.

The Heber Valley Rail Trail isn't merely an idea on a long-range planning map anymore.

It is approaching the point where residents may actually begin seeing it built.

The Bigger Story Is Connectivity

The most exciting thing about a new trail isn't necessarily the new pavement itself.

It's what that pavement connects to.

Heber Valley already has a growing collection of walking and biking infrastructure, but isolated sections aren't nearly as useful as a connected network. A beautiful one-mile trail can be great for recreation. Connect that mile to several other trails, neighborhoods, parks and destinations and it begins functioning as transportation infrastructure.

That's why planners frequently talk about filling “gaps” in trail systems.

Imagine a map with several excellent trails separated by busy roads or stretches where cyclists have to ride on a shoulder. The individual trails may be good, but the network isn't complete.

Every time one of those missing links is built, the usefulness of the entire system increases.

The Rail Trail is intended to become one of those links.

It Could Be Especially Valuable for Families

Heber Valley has no shortage of serious cyclists.

You can see them climbing mountain roads, riding gravel routes, racing trails and traveling long distances throughout the Wasatch Back.

Those riders aren't necessarily the people who benefit most from separated paved trails.

Experienced cyclists may be comfortable riding on a road shoulder or mixing with traffic. A parent riding with an eight-year-old usually isn't.

The difference between a painted bike lane and a separated trail can determine whether a family feels comfortable riding at all.

That is one reason active-transportation infrastructure can dramatically expand who uses bicycles.

A trail doesn't require you to be a cyclist.

You can be a parent teaching a child to ride. A senior taking an evening walk. Someone pushing a stroller. A runner training for a race. A teenager riding to meet friends.

Designing trails for those users can make them useful to a much broader section of the community.

Heber Valley Is Building Transportation Infrastructure on Several Fronts

The Rail Trail is arriving during an unusually active period for transportation construction around Heber Valley.

UDOT's 2026 project list includes work on US-189 between Wallsburg and Charleston, improvements along US-40, the SR-113 project in Midway and safety work planned for US-40 in Heber City. The much larger Heber Valley Corridor environmental study is also continuing, with its Final EIS and Record of Decision currently expected in spring 2027.

The Midway project provides a smaller example of how this infrastructure is changing.

Work at SR-113 and 400 East included roadway improvements, a new traffic signal, turn lanes and extended bike lanes. Major construction there was completed by September, with the new signal becoming fully operational September 22 and restoration work scheduled to continue into October.

Taken together, these projects show that transportation planning in Heber Valley is becoming about more than simply adding roads.

Cars remain dominant, of course. That's unlikely to change anytime soon.

But sidewalks, trails, bicycle facilities and safer crossings are increasingly part of the same conversation.

Growth Makes These Connections More Important

There is an obvious reason all of this is happening now.

Heber Valley is growing.

New neighborhoods mean more people traveling between homes, schools, stores, recreation areas and jobs. The Highlands development alone is planned for more than 800 homes near the Utah Valley University Wasatch campus, and construction there is expected to continue into 2028.

Every new home creates transportation demand.

Traditionally, the response to that demand has been almost entirely automobile-oriented: wider roads, new intersections and additional parking.

But rapidly growing communities around the country have discovered that it's difficult to build enough road capacity to eliminate congestion completely. As population increases, providing alternatives becomes more important.

In Heber Valley, trails have an additional advantage because they fit the identity of the community.

This is already a place where people hike, bike, run, ski and spend time outside.

Creating infrastructure that allows some of those activities to become everyday transportation isn't much of a cultural leap.

The Railroad Makes This Trail Uniquely Heber

Plenty of communities build paved trails.

Very few get to build one beside a working historic railroad.

That could give the Heber Valley Rail Trail a character that is difficult to reproduce elsewhere.

Imagine riding or walking along the corridor as one of the Heber Valley Railroad's vintage trains passes nearby. During fall, the mountains and cottonwoods would provide the backdrop. In winter, the North Pole Express could travel the same general corridor illuminated for Christmas while snow covers the surrounding valley.

That combination of transportation, recreation, scenery and history is uniquely suited to Heber Valley.

It also has tourism potential.

Visitors who already come here to bike, hike or ride the train may eventually have another easy recreational option that doesn't require driving to a mountain trailhead.

For local businesses, connected trails can also matter. Cyclists and pedestrians stop for coffee, meals and shopping just like drivers do—provided the trail system actually connects them to commercial areas.

What Happens Next?

The next milestone is less glamorous than a ribbon cutting but much more important.

UDOT needs to finish the remaining review and move the project into construction bidding.

According to the current schedule, bid advertising is anticipated in September 2026, followed by a potential construction start as early as December.

Once a contractor and final construction schedule are in place, residents should get a much clearer picture of when work will occur and when individual trail sections could open.

UDOT says normal construction hours are expected to be approximately 7 a.m. to 5 p.m., Monday through Friday, although schedules can change because of weather and material availability.

Given the time of year, flexibility will probably be important.

Anyone who has lived through a Heber Valley winter knows December construction schedules sometimes have to negotiate with Mother Nature.

A Small Project With a Potentially Big Impact

The Heber Valley Rail Trail won't attract the same controversy as the proposed bypass.

It won't cost hundreds of millions of dollars, fundamentally reroute US-40 traffic or transform the North Fields.

But transportation isn't only about giant projects.

Sometimes a relatively small connection changes the way people experience a community every day.

A trail can give a child somewhere safer to ride a bike. It can give neighbors a place to walk after dinner. It can connect neighborhoods that previously felt separated by traffic. It can create another recreation amenity for visitors while simultaneously serving residents who simply want to get across town without starting a car.

Most importantly, each new connection makes the next one more useful.

That's what makes the Heber Valley Rail Trail worth watching.

The valley already has extraordinary recreational trails in the mountains.

Now we're beginning to build something different down below:

a trail system that connects the community itself.

If the current schedule holds, the next major chapter could begin this winter.

And before long, the same historic railroad corridor that has carried passengers through Heber Valley for more than a century may be carrying walkers, runners and cyclists alongside it.

Next
Next

Heber Bypass Update: Where the Heber Valley Corridor Project Stands in November 2026